Document library · Document
11 18 20 20171129 Art Commission Final Presentation
Document details
- Dated
- Published by
- Sports & Exhibition Authority of Pittsburgh and Allegheny County
- In navigation
- Archive. Older than three years, so it lives here rather than in the navigation, and stays searchable in full text.
- File
- 9.1 MB PDF
What This Document Says
I-579 CAP Park Final Design to Art Commission Plans | References | Precedents 1 LaQuatra Bonci Associates · Sports & Exhibition Authority · November 29, 2017 I-579 CAP Park Prepared by Design Consultant • LaQuatra Bonci Associates • Communion LLC - Lake Byrd • Office of Public Art Artist Team • Dr. Kimberly C. Ellis • Amir Rashidd, CW • Jann Rosen-Queralt 2 LaQuatra Bonci Associates · Sports & Exhibition Authority · November 29, 2017 I-579 CAP Park SITE K EY PLAN ue ven ford A Bed ue ven lie A Wy I-57 9 Cra wfo Future Lower Hill Develoment rd S tree t oule vard Bigelow B hi Was ngto n Pla Cha ce tham Stre enue Mellon Green et Centre Av 9 PPG Paints Arena I-57 3 LaQuatra Bonci Associates · Sports & Exhibition Authority · November 29, 2017 I-579 CAP Park SITE IMPROVEMENTS PLAN - RENDERING Accessible Path Network to Downtown Existing Bigelow Boulevard Bridge Sidewalk rd Bo uleva Bigelow The Sitting Classroom/Gardens Trench Drain & Spiral hi Was ngto Event Lawn Out Parcel n Pla (not in project) ce Stormwater Management Story Wall Accessible Path Network Amphitheater/Mound Amphitheater/Mound Stage Lower Terrace Event Lawn Upper Cha Terrace tham Stre et Event Lawn enue Centre Av Existing Centre Avenue Bridge Sidewalk 4 LaQuatra Bonci Associates · Sports & Exhibition Authority · November 29, 2017 I-579 CAP Park DESIGN ENHANCEMENTS OVERALL COMBINED PLAN 5 LaQuatra Bonci Associates ·…
The opening of the document as extracted for this index. The full text is indexed and searchable; the file itself is the record.