City Manager Report April 28, 2025
Natural Gas Outage • Michigan Gas Utilities has sent a thank you to the community and utility crews after the natural gas outage: o The Michigan Gas Utilities (MGU) team is grateful to the Allegan County community for its incredible support throughout the recent natural gas restoration process. We appreciate every wave, kind word and delicious meals offered to our crews — thank you! We also thank WEC Energy Group’s crews from We Energies and Wisconsin Public Service in Wisconsin, Minnesota Energy Resources in Minnesota, and Peoples Gas and North Shore Gas in Illinois, along with Consumers Energy, for dedicating time away from their families to assist us. • Crews have visited all locations to restore service. If folks have been out of the area and not available to let the crews inside, they should call 800-401-6402 to schedule a time for a work crew to restore service and relight appliances. Draft Budget for Fiscal Year 2025/2026 • The budget process includes the following steps: o Community Survey of Priorities – Completed in December/January o City Council Sets Priorities for Fiscal Year – Completed in February o City Council Review/Approval of Capital Improvement Plan – February/March o Department Head Submittal of Requested Budget to City Manager – Completed in March o City Manager Submittal to City Council – Completed in April o City Council Workshop on Proposed Budget – Completed April 23 o Individual Meetings with Council Members to Answer Questions – As Needed o Additional Budget Workshops – As Needed o Public Hearing Prior to Adoption – To Be Scheduled o Council Adoption of Budget – Required No Later Than June 30 • Staff went over the draft budget at your recent workshop. The presentation and detailed budget are now on our website: https://www.saugatuckcity.com/uploads/1/3/3/9/133977444/website_budget_pac ket_link.pdf
Page 48
Text of page 48
The video of the workshop presentation can be viewed here: https://youtu.be/xIHrS9uO1L8?si=tEtxKi0ntNLgIrSC
Maple Street Project • Now that a design engineering proposal and cost share agreement with Township have been approved, Fleis and VandenBrink is moving forward with the next steps. Wetland delineation was scheduled for this week and soil borings are scheduled for April 30. Blue Star Trail • Staff completed the follow-up on the items that were discussed in the recent closed session. • The tribes advised that they are working to schedule their on-site evaluation. • The Friends of the Blue Star Trail has reached the second round in a corporate grant application to help provide more funding for the project. • As previously reported: o MDOT received concerns from a Tribal Nation and MDOT started coordination. The coordination and additional assessment process will be lengthy and construction in calendar year 2025 is now unlikely. o On site tribal evaluation is planned for this spring/early summer. o As more details are known, MDOT will move the allocated TAP grant funding to future years and evaluate additional funding. o I recently confirmed with the Department of Natural Resources that they are also willing to consider an extension of the trust fund grant. Kalamazoo River Greenway Plan • In 2018, in partnership with the Outdoor Discovery Center and municipalities throughout the County, a Kalamazoo River Greenway Plan was created. • In 2019, Council endorsed the plan to be used as an advisory document. A copy of the plan can be viewed here: https://tinyurl.com/ry4r7s • The Outdoor Discovery Center recently held a meeting with other tri-community stakeholders to discuss the progress we have made on the plan. The City had a lot of great progress to report on the goals of the plan including: o
o o
Intercommunity Pathway We remain hard at work on this with the Township, Douglas and Friends of the Blue Star Trail. Accessible launch We continue to have a boat launch on Spear and we have now transient/shopper boat docks installed outside of Coughlin Park. Habitat Restoration in Saugatuck Harbor Natural Area We had the Land Conservancy do an updated assessment of SHNA and incorporated their assessment into updates of the SHNA Master Plan. The wildlife committee has made recommendations on the deer concerns. Harbor Sediment Removal/Management
Page 49
Text of page 49
The Harbor Authority has requested funding support for consulting services to define goals and work that is needed in the harbor. The Township Manager and I recently met with the Army Corps staff to discuss regular dredging of their areas of responsibility and to discuss a request to conduct further sediment testing. Invasive Species Treatment in Habor We have been treating for Milfoil. Green Stormwater Infrastructure We now have our engineer reviewing new building or extensive addition plans and making sure that proper stormwater is incorporated into the plans. We have previously allowed ODC to install temporary rain barrels around downtown for education. The Parks and Public Works Committee recently received an educational presentation on stormwater management.
o o
o Concrete repairs are in the works for the boardwalk. o Saugatuck Wilds Nature Preserve will be opening soon to the public. o Improvements to the Mt. Baldhead restrooms and upper platform are actively being worked on. o The City Council approved a new Waterfront Preservation zoning ordinance.
AT&T Cellular • I talked with the AT&T project manager this week to get a status update. They remain interested in the project and are continuing to work through the necessary SHPO approvals. The Federal Communications Commission (FCC) is handling the government to government communications and sent AT&T some follow up questions this week. AT&T’s teams are meeting to work on their response. • AT&T’s decision on the City’s agreement request remains pending resolution of SHPO approval. Miscellaneous • Attended Election Commission meeting. • Held one on one meeting with City Clerk. • Held one on one meeting with Deputy City Clerk/Administrative Assistant. • Held one on one meeting and several additional budget meetings with the City Treasurer/Finance Officer. • Held Department Head team meeting. • Attended Convention and Visitors Bureau Board meeting. • Attended meeting with Township Manager, Douglas Manager, and Edgewater Resources to discuss Kalamazoo Harbor Authority consulting needs. • Attended public accuracy test for voting equipment. • Attended meeting with Army Corps to discuss harbor. • Met with VFW to discuss parade questions. • Met with legal, MTS, and Director of Planning and Zoning. • Scheduled to attend Arbor Day tree planting ceremony.
Page 50
Text of page 50
Blast from the Past • Below is a publication that was in the paper on April 25, 1963. • As the community assesses whether to make any changes to local watercraft controls on Kalamazoo Lake, another reminder that these conversations go back many years. The community survey is live and we have had a great response so far. Please encourage folks to share their feedback: https://www.surveymonkey.com/r/JNVNCL2
Page 51
Text of page 51
Treasurer Report
April 28, 2025
Tax: • • • • • •
Work through several requests for tax payment requests from property owners. The occasional address update, too. Received the reimbursement check from the school and the Fire department for the last NSF tax payment Processed several property tax checks from the County. Ordered new tax bill paper Started the process of learning how to import mortgage codes from the two biggest property tax payment agencies (CoreLogic and Lereta). Updated our Interurban contact information.
Payables: • • •
Continue to convert the vendors from Peter’s account information to mine Processed a payables run Set up a vendor for ACH payments
Miscellaneous: • • • • • • • • • • •
Working with a fellow treasurer to help teach me the full reconciliation process. Took a variety of credit card payments (parking fines, permits, etc) Worked on prepping for next year’s budget. Meeting with Ryan to work through it. Helped with some of the presentation slides, too. Pushed Comcast again for a timeline on the franchise fee make-up amount. Answered some of the gas line inquiries. Answered a FOIA request. Started gathering quotes for reinvesting the CD that’s about to mature Helped with a variety of Oval Beach items Working with KLSWA on receiving water fee contact information. Review the legal documents set up with the Township Set up online access with WinTrust (bought out Macatawa Bank)
Payroll: • • •
Working to develop processes and procedures to eliminate inefficiencies and potential errors Processed the 04/21/25 payroll Finished the last of the pension forfeiture.
Page 52
Text of page 52
Cty of
a.M":JJtEIT.1868
City Clerk Department Report April 28, 2025 Activity Since April 14 ► Elections: - There will be a May 6, 2025 election with ballot language from Ottawa Area ISD - We received $3K in wage reimbursement for early voting. ► Currently processing 2025 Business Licenses, 55 have been executed. ► Street Ends will be started on Monday, April 28. ► We have one Wick's Park Boat Slip and will have another lottery. ► Currently have 4 FOIA requests. ► Coordinated and prepared meeting packets and minutes. ► Clerk Meetings: - City Council Meeting - Wolters - Jazz for Justice Safety Meeting - Wolters - Department Head Meeting - Wolters - Public Accuracy Test - Wolters - Parks and Public Works Meeting - Wolters - Memorial Day Parade Safety Meeting - Wolters - City Council Workshop - Wolters
Page 53
Text of page 53
Planning, Zoning and Project Report April 28, 2025
Planning and Zoning • • • • • • • • • • • •
Participated in scheduled internal team meetings. Prepared for and participated in ZBA meeting. Cancelled PC meeting due to lack of Quorum. Sent email to STR owners and Agents regarding regulation changes. Had multiple meetings regarding regulation changes. Spoke with legal regarding various topics. Had meeting with MTS regarding potential enforcement issue. Attended budget meeting virtually. Met with residents regarding future commercial development. Discussed STR enforcement plans with Horizon. Maintained general code enforcement follow-up efforts. Issued permits and completed casework as detailed below.
Page 54
Text of page 54
Open Casework 550 Dunegrass Circle
568 Mason
Received notice of violation from EGLE. Researched property to ensure process shall be followed, in talks with developer in regards to potential development, will address requirements in regards to EGLE violation when determined. Had discussion with contract planner to determine how to move forward with proposed development. Further research done on SLU and Site Plan approval for 500 and 550 Dunegrass. sent legal questions for appropriate next steps. Reached out to developer with information regarding potential future project and also with plans to resolve EGLE violations. Reps from site will be required to submit vegetation removal plan to the PC. Developer stated that they would be reaching out to an environmental consulting firm to put together information. had discussion with environmental consultants on what needs to be provided to the PC. Received questions from environmental consultants, scheduled call with developer for further discussion. Emailed environmental consultants with expectations for site plan review application. Application received, invoice sent. Scheduled for may PC meeting. Emailed Contractor about damaged water line. Sent application to engineer. Asked applicant for more information. Confirmed Drawings are being made. Spoke with developers about issue. Still awaiting complete application and drawings for work completed onsite to address waterline issue. Had further discussions about what happened on site and emailed engineer and KLWSA to determine appropriate action. Recommendations received from Kal Lake and City Engineer, passed on to Contractor. discussion on utility work continues. Invoice for Asphalt work sent to Contractor. Further confirmation still needed, discussion with contractor, engineer, and KLWSA continue. Spoke with contractor for update. discussions continue with Contractor and Kal-Lake. Reached out to contractor to again discuss reimbursement for Kal-Lake. Called Alex for update, left voicemail. Advised MTS that occupancy permits would not be issued while an outstanding balance exists and sidewalk unfinished.
Enforcement
KLWSA
Page 55
Text of page 55
405 Park St
807 Lake St 7 249 Mason
304 Lucy St
555 Griffith St 338 Park St
781 Manchester Dr
131 Mason St
Received application for addition of bathrooms and interior renovation. Sent to Contract planner for discussions. Administrative review deemed inappropriate due to location and scope of project, Formal site plan review scheduled for pc. Site plan review approved contingent upon applicable flood plain requirements being met. Waiting on owner to send additional documentation. Emailed owner regarding conditioned site plan approval and asked about required documentation. Had meeting with owner concerning EGLE requirements and location of flood plane. Incomplete STR application received. Sent back to local agent. Received info, asked for further information. Info received, sent to fire department. Change of Use application received. Had discussion with fire department and sent request for more information to applicant. Had meeting with owner regarding proposed deck, agreed that major site plan amendment is necessary. Received STR renewal with new owners. Noted a different license holder on application from previous years. Transfer occurred Jan 2024, existing certificate never updated. Application denied due to unauthorized transfer of ownership. Email and letter sent to owner. Discussions with the owner and local agent in regards to appropriateness of denial was had. Owner to provide timeline of events for argument to be sent to legal. Explained to owner that their application is considered denied due to transfer. STR application received. Sent to fire department. Notified of pipe burst at property, inspection postponed until further notice. Application received for existing STR. Noted transfer from owner to LLC, notified owner that license is currently pending. Sent email to applicant explaining that due to transfer of ownership to LLC, application is currently pending. Spoke with applicant about upcoming City Council Workshop. Updated owners on pending language. Pending language approved. sent to fire department. STR application received. Sent email to applicant explaining that due to transfer of ownership to LLC, application is currently pending. Updated owners on pending language. Pending language approved. sent to fire department. Fire department notified me of fence blocking egress, owner intends to remove panel of fence, emailed HDC chair to confirm that administrative approval is appropriate for modification of a fence behind a building line.
Zoning
STR
STR
STR STR
HDC
Page 56
Text of page 56
405 Park St
120 Mary St
237 Francis St 665 Spear 70 Park St 403 Water St 421 Water St 347 Water St 403 Water St 717 Water St 5 439 Butler St
128 Elizabeth St 13 825 Bridge St 449 Water St
615 Park St 8 152 Butler St 842 Lake St 10 97 Park St 1035 Holland St
Received concerns for a floating dock at 405 Park which has no permits. Reached out to owner for clarification. Owner claims dock placed 4 years prior. No permits issued for dock. Spoke with Legal regarding enforcement action. Spa application received, HDC approved on 05-23-2024. Dimensions different from what has been approved, sent to HDC chair for clarification on process. Sent email to contractor notifying them of dimensional difference and need for HDC meeting. STR application received. More info needed. Info received, sent to fire department, Had meeting with resident about final requirements for occupancy permits and explained that there are no available STR licenses in the CR district. Spoke to applicant about installation of solar. Application received, Sent invoice. Received notice of proposed change of use. Provided resources. Application expected. STR Application received. More info needed. Sent to fire department. Potential enforcement case noticed. Emailed legal for discussion. Received application for internal remodel of Personal Service establishment. Sent to fire department and MTS.
Enforcement
STR application received, More info needed. Sent to fire department. Provided information and resources regarding project in the Historic District. Awaiting application. HDC application received for window replacement received, advised that board review would be required. Sent invoice. STR Application received, sent to fire department.
STR
STR app for ADU received, waiting on insurance info.
STR
Renewal of EODA, 4 spaces for 6 months. Invoice sent, waiting on insurance info. Left voicemail on 04-17-2025 to notify owner that EODA remains unpaid and work may not begin until payment is received, also noted that City Hall is closed 04-18-2025. Applicant paid str renewal, supplied no application. Resources sent to applicant. HDC Application to replace 10 sq ft of entry way with concrete. Sent invoice to applicant. STR application received, sent to fire department.
EODA
Received insurance information for STR. Sent STR application to owner. Received STR application. Transfer occurred 02/26/2025, on hold for now.
STR
Zoning
STR STR Zoning Zoning STR Enforcement Zoning
HDC
STR
STR HDC STR
STR
Page 57
Text of page 57
220 Culver
Received application for sign in historic district. Received approval for administrative sign off. Sent invoice to applicant. had discussion regarding multi unit fence project. Send app and fence regulations. HDC Application for historical marker to replace existing sign. Application received, no payment. Sent invoice.
HDC
STR
230 Griffith St
Application received, more info needed. Info provided, sent to fire department. Application received, no payment. Sent invoice.
807 Lake St 10
Application received, no payment. Sent invoice.
STR
444 N Maple St
Application received, no payment. Sent invoice.
STR
673 Lake St
Zoning application received for pool house and pool in rear yard, provided review of project to applicant and advised lot coverage is being exceeded. ROW application for natural gas installation received.
Zoning
Enforcement
633 Butler St
Potential enforcement case. Site work observed, emailed EGLE and Allegan County to ensure no permits from them is required. STR Application received, need signature for Fire inspection. Sent to Fire Department. STR Application received, need signature for Fire inspection. Sent to Fire Department. STR Application received, more info needed.
345 Griffith
STR Application received, sent to fire department.
STR
153 Lucy St #1
STR Application received, sent to fire department.
STR
153 Lucy St #2
STR Application received, sent to fire department.
STR
153 Lucy St #3
STR Application received, sent to fire department.
STR
731 Water St
STR Application received, sent to fire department.
STR
97 Park St
STR Application received, sent to fire department.
STR
320 Mason St
STR Application received, sent to fire department.
STR
410 Hoffman
STR Application received, sent to fire department.
STR
229 Francis St
STR Application received, sent to fire department.
STR
245 Spear St
STR Application received, sent to fire department.
STR
611 Lake St
HDC application received for Sauna in rear yard.
HDC
985 Ridgeview Ln
STR Application received, sent to fire department.
STR
550 Mason St
STR Application received, more information needed.
STR
347 Park St
STR Application received, more information needed.
STR
1055 Holland St
STR Application received, sent to fire department.
STR
230 Griffith St
STR Application received, sent to fire department.
STR
165 Elizabeth St
STR Application received, sent to fire department.
STR
1039 N Maple St 303 Culver St 344 Francis St 807 Lake St 1
646 Francis St 405 Park St 347 Water St #2 347 Water St #3
Zoning HDC STR
STR
ROW
STR STR STR
Page 58
Text of page 58
Closed Casework 131 Griffith St
application for street cut ROW permit. Invoice sent. Discussions had with Engineer and DPW Director to provide stipulations. Notified applicant that they must Contact Fleis & VandenBrink to arrange for observation of the work as indicated in the ROW permit application. ZBA application received for variance from waterfront fence requirements. Variance Granted. Fence permit issued and sent to MTS. Applicant noted during meeting that boardwalk may need to be closed for work on the fence, sent ROW permit application. STR application received. Sent to fire department. License issued. Spoke to applicant about installation of solar. Application received, Sent invoice. Permit issued.
ROW
403 Water St
Observed Feather Flag, sent email requesting it be removed as it is prohibited by our ZO.
Zoning
787 Manchester Dr
Had discussion over fence requirements.
Zoning
852 Newnham St
Received EGLE approval for minor waterfront construction, notified owner that permits would be required, sent application. STR Application received, need payment. Payment Received, Sent to fire department. License issued.
Zoning
STR
338 Park St
received notification of reinspection without payment. Sent invoice to STR owner. STR application received, More info needed. John came to confirm additional trash receptacles and pay. Sent to Fire Department. License issued. Receive questions regarding converting property into staff housing. Had discussions regarding use and regulatory changes that would be required to allow for staff housing in R-1. Spoke to resident regarding concerns for construction at neighbors property and recently approved STR ordinances. Answered STR questions regarding regulation changes.
128 Elizabeth St
Answered STR questions regarding regulation changes.
STR
860 Simonson
Answered STR questions regarding regulation changes.
STR
565 Weirich Dr
Answered STR questions regarding regulation changes.
STR
345 Hoffman
Answered STR questions regarding regulation changes.
STR
312 Hoffman
Answered STR questions regarding regulation changes.
STR
97 Park St
Answered STR questions regarding regulation changes.
STR
612 Holland St
Answered STR questions regarding regulation changes.
STR
526 Butler St
Answered STR questions regarding regulation changes.
STR
40 Butler St
790 Simonson 70 Park St
991 Ridgeview Ln 540 Mason St 446 Culver St 888 Holland St
1026 Holland St
ZBA
STR Zoning
STR
STR Zoning
STR STR
Page 59
Text of page 59
781 Manchester Dr
Answered STR questions regarding regulation changes.
STR
433 Mary
Answered STR questions regarding regulation changes.
STR
339 Lucy
Answered STR questions regarding regulation changes.
STR
515 Water
Answered STR questions regarding regulation changes.
STR
332 Mary
Answered STR questions regarding regulation changes.
STR
311 Water
Answered STR questions regarding regulation changes.
STR
141 North
Answered STR questions regarding regulation changes.
STR
417 Spear
Answered STR questions regarding regulation changes.
STR
810 Park
Answered STR questions regarding regulation changes.
STR
347 Park St
Answered STR questions regarding regulation changes.
STR
822 Allegan
Answered STR questions regarding regulation changes.
STR
165 Elizabeth
Answered STR questions regarding regulation changes.
STR
580 Mason
Answered STR questions regarding regulation changes.
STR
550 Mason
Answered STR questions regarding regulation changes.
STR
648 Pleasant
Answered STR questions regarding regulation changes.
STR
702 Lake
Answered STR questions regarding regulation changes.
STR
720 Butler St
Answered STR questions regarding regulation changes.
STR
302 Culver
Had meeting with owner regarding potential future development within the City of Saugatuck
Zoning
347 Water St 4
STR Application received, more info needed. Sent to fire department. License issued. Answered STR questions regarding regulation changes.
STR
Application received for Dumpster to be placed on Mary Street from 04-17-2025 - 04-21-2025. Invoice sent. Permit issued. Answered STR questions regarding regulation changes.
ROW
Fence application received for Multi Family units. Asked for more details on location. Info received. Permit issued. SPR application received, Sent to engineer for stipulations regarding drainage. Discussions continued on storm water mitigation, engineer comfortable with plans. Permit issued. STR application received, sent to fire department. License issued. ROW app from Lakefront roofing for truck and trailer to be parked to assist with reroof. Permit issued.
Zoning
EODA
790 Lake St
Applicant reached out to renew EODA for the year, 2 spaces for 6 months. Asked for updated insurance. Insurance provided, sent invoice. Invoice paid Answered STR questions regarding regulation changes.
1045 Elizabeth St
Application for second story addition received.
Zoning
1035 Park St
Minor Waterfront Construction application received. Sent letter to neighboring properties. Permit issued.
Zoning
743 Allegan 449 Water St 842 Lake St 3 1039 N Maple St 149 Griffith St
129 Griffith St 12 747 Pleasant St 128 Hoffman St
STR
STR
Zoning
STR Zoning
STR
Page 60
Text of page 60
302 Culver St
565 Weirich Dr
150 Taylor St
Application received for paint touch ups to building. Confirmed with Chair that project is just maintenance and requires nothing from HDC. Confirmed this with applicant. Notified of potential enforcement case for STR. Spoke to License holder who agreed to correct violation. Sent info to Horizon to follow up on enforcement. No further action at this time. Application for STR renewal received. More information needed from applicant. Info provided, sent to Fire Department. Sent email to applicant explaining that due to transfer of ownership to LLC, application is currently pending. Notified applicant of STR regulation changes. License issued.
HDC
Enforcement
STR
Page 61
Text of page 61
Department of Public Works Below is a summary of notable activities carried out by the Department of Public Works since the last council meeting on 4/14/2025: Tree Work: Trees that had been removed this past winter are now being replaced. This includes this year’s Arbor Day tree which will replace the black willow tree that was lost in Cook Park due to wind damage. The replacement tree is a Princton American Elm. To celebrate Arbor Day and to acknowledge Saugatuck City’s 20 th year being recognized as a Tree City USA community by the Arbor Day Foundation and the National Association of State Foresters, a ceremony took place at Cook Park last Friday April 25 th. Brush and Leaf Collection: The April brush and leaf collection occurred on April 15th for the east side of the Kalamazoo River and April 16th on the west side of the Kalamazoo River. DPW hauled 34 dump trucks of material out of the City during the April collection. Junk Collection: Each spring, residents can set household items along the curb for the DPW to collect and dispose. This year’s junk collection was on April 21st through the 24th. The materials collected filled two 40-yard dumpsters and two 30-yard dumpsters as of the time that this report is created. That brings the total to at least 140 cubic yards of household junk for 2025. Oval Beach: As we begin preparing the Oval Beach for the summer season, one of the first steps is to remove the erosion control fencing. Approximately half of the erosion control fencing was removed last week. Once removed, we can clean the parking lot and deposit the sand back onto the main beach where it can be leveled. Meetings: • 4/14/2025 – DPW Weekly Goals Meeting • 4/14/2025 – City Council Meeting • 4/14/2025 – Jazz for Justice Safety Meeting • 4/15/2025 – Oval Beach Management Meeting • 4/16/2025 – Department Head Team Meeting • 4/17/2025 – Pavement Marking Meeting/Site Visits • 4/17/2025 – DPW Weekly Goals Follow Up Meeting • 4/18/2025 – Good Friday – Holiday • 4/21/2025 – DPW Weekly Goals Meeting • 4/22/2025 – Parks & Public Works Committee Meeting • 4/23/2025 – Memorial Day Parade Safety Meeting • 4/25/2025 – DPW Weekly Goals Follow Up Meeting
Page 62
Text of page 62
Allegan County Sheriff's Report
March 2025 stats 45 total dispatched calls and/or self-initiated calls Abandoned 911 calls – 1 Alarms - 3 Animal – 1 Assist other agencies – 2 (assist to fire/ems on medicals) Check Welfare – 1 Civil – 1 Conservation – 1 Found property – 1 Fraud - 1 General assist – 21 Loud noise – 1 Open Door – 2 Parking – 1 Road Hazard – 1 Suspicious situation - 1 Trespassing - 1 Below are traffic stops by the 4 Deputies contracted by the city and amount of times they are at the school. Traffic stops – 50 School contacts – 17
The 4 Deputies spent some time at training during March as well. Deputy Kaminski was at advanced accident investigation training, Deputy Hoover was at advanced evidence technician training, Deputy Haskill attended a low light firearms instructor training and Deputy Castro attended the Allegan County Safe Schools conference.
Page 63
Text of page 63
City of Saugatuck Status Report of Engineering Activities April 24, 2025 General Consultation •
2024 Asphalt Repairs: The project is complete with the exception of punch list work to be completed soon.
Village Square Court Renovation: The DNR Passport Program application was submitted prior to the April 1 deadline and has been confirmed as administratively complete. Preliminary scoring will be released late summer or early fall, at which time revisions/additions can be made.
Developed a proposal for inspection of larger culvert crossings and storm sewer outfalls. This work could be completed in phases and areas of concern could be prioritized.
3-year contract for pavement markings was awarded on March 24 and we are in the process of getting the contract in place. Attended a pre-construction walkthrough with the contractor to review specifics. Work is to be completed by mid-June each year.
Assisting with review of water and sewer agreements as needed.
EGLE Technical, Managerial and Financial (TMF) Project • • •
The City was awarded $221,600 in funding from EGLE’s Community Technical, Managerial, and Financial (TMF) support for lead service line identification (100% grant). Prepared the City’s Complete Distribution System Materials Inventory and submitted it to EGLE to meet the October 16 deadline. An updated version will be provided when potholing work is complete. Potholing work is anticipated to be completed soon. A number of addresses have been added to fully utilize the grant dollars available.
Mt. Baldhead Projects • • •
AT&T Project Assistance o Providing assistance on an as-needed basis. Restroom Building Replacement o Presented bids at the April 23 council workshop. o The Notice of Award will be issued after an award is made. Observation Platform Replacement o Design work is progressing. Additional survey work is complete. o The Allegan Conservation District has provided the Vegetation Removal Assurance, which is a report required for the EGLE/USACE Critical Dunes Permitting. The report evaluates impacts on vegetation, native, non-native and invasives, and provides guidance for the design and construction. The report includes guidance for several of the unhealthy, dead or undesirable species to be removed as part of the project and replaced with native/desirable ones.
Page 64
Text of page 64
Sea Wall and Concrete Repairs • • •
The project is out for bids. Bids are due April 30. The bid package included two options for construction. Preference will be completion prior to the 4th of July with a backup for fall construction starting after Labor Day. Met with DPW and steel fabricator to provide direction for short term ramp framing repairs at the chain ferry.
Maple Street Improvements • • • •
Design work is underway. A kickoff meeting will be scheduled with City staff soon. Additional survey for the DPW asphalt resurfacing work is being scheduled. Wetland delineation work is scheduled to be completed on April 24. Soil borings are tentatively scheduled for April 30.
Park Street Improvements – Study Phase •
Park Street between Campbell Road and Mt. Baldhead has no specific non-motorized facility and a number of unique challenges and right-of-way encroachments. The asphalt pavement is deteriorating. A number of development projects have recently been completed or are ongoing along the corridor. A planning phase proposal has been developed to build on prior study work and develop a scope, concept and cost estimate for improvement of the corridor. We are awaiting results of our application to EGLE’s Michigan Coastal Management Program, which was submitted on December 20, 2024 followed by a council resolution on December 23. If funded, the grant would cover up to 50% of the planning cost and an updated proposal will be prepared to align with the funding. EGLE has reached out several times with follow-up questions/clarifications on the application.