About the project

The Town will use grant funds to design and construct the rehabilitation/replacement of Water Treatment Plant (WTP) components that are at the end of their useful life. This includes the complete rehabilitation of the two Trident filter treatment units. Additionally, the project will evaluate other WTP equipment identified in the asset management that are nearing the end of their useful life including the replacement at the Pressure Reducing Valve (PRV) Station and equipment at the South Main Street Tank located. Scheduled SCADA equipment replacement and upgrades will be incorporated into the project. Grant funds will be used in conjunction with New Hampshire Drinking Water State Revolving Fund (DWSRF) loan funds to complete the engineering, design, bidding and construction for the project.

Open filter channels of water inside a treatment station
Filter station, Wolfeboro
A green strainer housing with pressure gauges and handwheel valves
Raw water strainer, Wolfeboro
A single-story brown facility building with pickup trucks parked outside
Wolfeboro's water facility

How it was funded

Funding for this project by program
ProgramAmount
American Rescue Plan Act$735,000
Drinking Water State Revolving Fund$735,000
NHDES funding$1,470,000