Plymouth · Grafton County
Town of Plymouth: Critical Flood Resiliency Infrastructure
- Approved
- December 21, 2022
- NHDES funding
- $51,893
- Water system
- Flood risk
- Kind of work
- Construction
About the project
ARPA funding will be used to support final design and permitting for the replacement of a 6’ round corrugated metal pipe with a 10’x6’ pre-cast concrete box culvert. The Town’s 2021 Hazard Mitigation Plan and 2018 Master Plan both identify replacement of the Loon Lake Road culvert as a top priority. When Loon Lake Road is closed due to flooding, access to over three miles of town roads is completely cutoff.
How it was funded
| Program | Amount |
|---|---|
| American Rescue Plan Act | $51,893 |
| NHDES funding | $51,893 |