New Hampton · Belknap County

New Hampton Village Precinct: Drinking Water Infrastructure

Approved
October 4, 2022
NHDES funding
$240,000
Water system
Drinking water
Kind of work
Construction

About the project

The New Hampton Village Precinct will use the American Rescue Plan Act (ARPA) grant funds for improvements to the existing treatment system to address the elevated levels of disinfection byproducts (DBPs) and improve corrosion control. The treatment modifications will include filter media replacement for the existing 2-stage filtration process, plumbing modifications, installation of a coagulant feed system, filter valve replacement and interface with SCADA, and additional treatment plant interior modifications to accommodate the treatment improvements. All work will take place within the existing treatment facility building. Grant funds will be used in conjunction with NH Drinking Water State Revolving Fund (DWSRF) loan funds to complete the engineering, design, bidding, and construction for the project.

How it was funded

Funding for this project by program
ProgramAmount
American Rescue Plan Act$150,000
Drinking Water State Revolving Fund$90,000
NHDES funding$240,000
Total project cost$240,000