Pablo 31A Chute Replacement

River or area

Mission Valley reservoirs and canals

Pablo

Status

Completed

Now

Completed spring 2025.

Contact

Mark Simpson

Irrigation Infrastructure Program Manager
(406) 675-2700 ext. 1283

Confederated Salish and Kootenai Tribes
Natural Resources Department
Division of Engineering & Water Resources

Project Overview

An aging 626-foot concrete chute is set on a steep slope and is operated by FIIP conveying an estimated 50 cubic feet per second. In 2019, FIIP installed materials to reduce seepage. This project will include replacing the concrete chute with a buried 36-inch diameter steel pipe, new concrete inlet structure with debris screen and a new energy dissipation structure at the pipe outlet. Maximum flows will remain the same, however, the improvements will increase operator safety. Seepage mitigation will protect the headworks and chute structures from soil erosion around the foundation.

Design drawing

Site Plan

Preliminary site plan for the 31A canal chute rehabilitation over an aerial photograph: the buried pipeline replacing the existing concrete chute down the slope, from the gate at the top to an impact basin at the bottom.
The buried pipeline that replaces the 31A concrete chute, from the top gate to the impact basin. Open full size

By year

Phases

  1. 2022 to 2023

    Design

    Done

  2. Summer and fall 2024

    Construction

    Done

  3. Spring 2025

    Completed

    Done

Before replacement

The Old Structure

Water rushing down the old concrete chute on a steep grassy slope into a churning basin.
Pablo 31A Chute The old concrete chute