Charlo Area Water Management Improvements
River or area
Mission Valley reservoirs and canals
Charlo
Program
Status
In design
Now
The Final Draft of the Integrated Water Management Plan is being developed.
Updated September 2023
Confederated Salish and Kootenai Tribes
Natural Resources Department
Division of Engineering & Water Resources
Project Overview
The Charlo Area Water Management Improvements project aims to rehabilitate and modernize the Flathead Indian Irrigation Project (FIIP) irrigation infrastructure serving the Charlo area. The instream flows and river diversion allowances of the CSKT Water Rights Compact require water management improvements to accomplish the water conservation objectives. Although other localized infrastructure projects are being implemented, the CSKT selected the Charlo area as the highest priority for implementing water management improvements at a larger geographic scale.
The existing irrigation diversion and distribution system is being evaluated to identify opportunities for improved water management to provide increased instream flows while limiting environmental effects and improving irrigation delivery service. This will be accomplished through upgrades to the river diversion structures and modernization of the irrigation distribution system.
By year
Phases
2023
Integrated Water Management Plan
Done
To be determined
Phased design of plan components
Ahead
To be determined
Construction
Ahead
On site