Status

Under way

Now

Under construction. The Tabor Feeder Canal road is closed until November 2029.

Contact

Mark Simpson

Irrigation Infrastructure Program Manager
(406) 675-2700 ext. 1283

Confederated Salish and Kootenai Tribes
Natural Resources Department
Division of Engineering & Water Resources

Workers in hard hats inspect a long timber shoring wall along an excavation below a forested slope.
North Fork Jocko Diversion Inspecting the shoring along the excavation

Constructing a new rock ramp fishway, fish screen, and diversion structure to improve fish passage while maintaining reliable irrigation deliveries.

the year the original diversion was built
1924
of the Mission Valley's irrigation water supply
15%+

Project Overview

The North Fork Jocko Tabor Diversion Project is located at the intersection of the North Fork Jocko River and the Tabor Feeder Canal, approximately 1.5 miles downstream of North Fork Jocko Falls. The purpose of the project is to address reliability, operational, and environmental issues by replacing the diversion structure.

The original facility, built in 1924, consisted of a concrete diversion dam spanning the North Fork Jocko River. The facility is owned and operated by the Flathead Indian Irrigation Project (FIIP). Water diverted at this facility enters the Tabor Feeder Canal and is conveyed several miles to Tabor Reservoir (St. Mary’s Lake). This trans-basin diversion from the Jocko watershed to the Mission Valley supplies over 15% of the Mission Valley’s irrigation water supply, and serves as the primary inflow to Tabor Reservoir.

Prior to modernization, this critical irrigation infrastructure was in significant disrepair with multiple structural, operational, and environmental deficiencies. These included deteriorated concrete and diversion gates, worker safety issues, and lack of any fish screening in the canal. Additionally, the structure impeded natural sediment movement, adversely affecting water quality and significantly degrading aquatic habitats upstream. This irrigation modernization project aims to comprehensively address these deficiencies and reconnect stream habitat for native fish, protect Bull Trout and Westslope Cutthroat Trout, and improve long-term reliability for irrigators and other water users. Construction activities will occur over the next four years. During construction, the Tabor Feeder Canal road will be closed. Please see map for additional details.

The primary objectives of the Project are as follows:

  • 1) provide water diversion from the NF Jocko and conveyance flows from the Middle Fork Jocko River, to Tabor Reservoir via the Tabor Canal
  • 2) provide means of passing bedload downstream of the diversion during runoff and/or flushing of accumulated bedload
  • 3) provide fish passage upstream of the diversion
  • 4) provide screening of the Tabor Canal and fish bypass for downstream migrants to the NF Jocko below the diversion structure.

Road closure

Tabor Feeder Canal road closure

Closed now until November 2029, from St. Mary's Lake to Jocko Canyon Road.

By year

Phases

  1. 2021 to 2024

    Design

    Done

  2. 2025 to 2029

    Construction

    Under way now