Website concept by Stoa · Not the official Village of Schaumburg website
Village of Schaumburg home
A Village of Schaumburg snow plow clears snow from a road
A Village plow on a snow route

Schaumburg Construction Dashboard

Schaumburg’s Construction Dashboard contains the latest information on the status of projects currently under construction or soon to be under construction in the village. 

Access the online construction dashboard.

In addition to viewing the dashboard, users can sign up to receive construction updates via email.

Street Improvement Program

A list of streets included in the 2026 Street Improvement Program is available .

  • Full Reconstruction - Reconstruction consists of the partial or full removal of the existing pavement structure. The scope would also include concrete curb and sidewalk removal and replacement where warranted, drainage improvements, and sod restoration.
  • Modified Reconstruction - Streets categorized for reconstruction that are lower volume residential streets, that are determined to have a base course that is stable and sufficient for the use of the street, and can be considered for patching and a structural overlay reconstruction instead of full pavement replacement.
  • Corrective Resurfacing - Corrective resurfacing consists of surface replacement that provides for the removal of the existing asphalt pavement surface and replacement with a new asphalt pavement surface. Localized base repairs consisting of pavement patching where necessary, concrete curb and sidewalk removal and replacement where warranted, drainage improvements, and sod restoration.

The listing of streets is subject to change.

Page owner: Engineering and Public Works

Reviewed Oct. 2026 · next review April 2027