City Council Agenda Item Report FROM:

Ryan Cummins, City Manager

MEETING DATE:

February 19, 2025

SUBJECT:

Funding Plan for Maple Street Project

DESCRIPTION: Maple Street and the underground water main are in need of replacement. City Council listed roads, asset management, and lead service line replacement as essential infrastructure priorities for the fiscal year. This work is also on the City’s capital improvement plan. In June, Council approved an engineering proposal to plan for the Maple Street improvements. Since that time, the City’s engineers and staff have conducted an open house to gather public feedback, topographic surveys, meetings with Township officials, and developed estimates for various options, which include: • • • •

Road resurfacing or reconstruction Water main replacement (including replacement of services, some to inside the home/building) Drainage and stormwater management improvements Non-motorized improvements (widened shoulders, sidewalk, or similar)

The City Engineer presented the options and costs at the January 22 work. Attached are the documents from that meeting. Council requested a plan to fund the project items below. Fund Balances and Revenues The City currently has healthy fund balances and additional anticipated revenues in its various funds: Current Fund Balances (Savings) General Fund 6,258,658 Major Streets 780,669 Local Streets 2,249,674

Page 29

Page 29 of the packet; its text follows
Text of page 29

Water-Sewer

579,449

Notes Local millage that can be used for "repair, maintenance, renovation, and improvement of 388,000 public roads". County millage dollars to the City that can be used for “preservation and preparation” 190,000 along with resurfacing. State dollars used for maintenance and winter needs as well as road rehabilitation. Portion also has to be used for 190,000 non-motorized. 768,000

Road Revenue Per Year

Local Road Millage

County Road Millage

Act 51 Total

Water Fund Revenue Per Year Water Infrastructure Fee

300,000

Other Funding Sources The Township is agreeable to a 50/50 cost share on water main and sanitary sewer work, as well as rehabilitation of one lane of road above the water main. The City secured a $250,000 state grant to crush and reshape the road. Proposed Funding Plan The project is scheduled to occur at the end of FY 25/26 and beginning of FY 26/27. Based on current fund balances, anticipated water infrastructure revenue, and road revenues (Act 51, local road millage, and county road millage), staff recommends funding the following project elements as follows: Maple Street Project Items Water Main Replacement - City Water Main Replacement - Township Sanitary Sewer Repairs - City Sanitary Sewer Repairs - Township Crush and Shape Road Rehabilitation - City Crush and Shape Road Rehabilitation - Township 5-Foot Concrete Sidewalk Underground Stormwater Detention Culvert Repairs

 Page 2

$835,000 $835,000 $60,000 $60,000 $1,005,000 $405,000 $1,070,000 $120,000 $30,000

Page 30

Page 30 of the packet; its text follows
Text of page 30

DPW Parking Lot Paving

$170,000 Estimated Project Cost $4,590,000

Proposed Funding Township Half/Share of Water Main Replacement, Sanitary Repairs, and Rehabilitation of Road Over Watermain MDOT Category B Grant - Road Rehabilitation Water-Sewer Fund Local Streets Fund General Fund

$1,300,000 $250,000 $900,000 $1,220,000 $920,000

Additional Options • HMA Path Instead of Sidewalk o If Council desires an HMA path instead of the sidewalk, an additional $90,000 would come from the general fund. • Full Road Replacement o If Council desires full road reconstruction on the eastern lane instead of crush and shape, this will be an additional $415,000 from the local streets fund. • Additional Grants o The Township and City have reached out to staff for State Senator Nesbit and State Representative Andrews to request a $3,080,000 Michigan Enhancement Grant (one time appropriation/earmark) to fund the watermain and lead service line replacements, sanitary sewer work, and road rehabilitation. • Phased Project o The project could be phased and spread out over more years, but will end up in a more costly project with mobilization and inflationary increases in construction costs. • Special Assessment o The City could choose to do a special assessment to the Maple Street property owners for a portion of the project costs. • Bonds or Loans o The City could choose to use debt service to fund the project. This would add interest costs to the project but spread the payments out over several years. If Council is comfortable with the current funding plan, the City Engineer will prepare an engineering proposal to proceed with design of the elements. LEGAL REVIEW: The City Attorney will be at your meeting to answer any questions you may have. SAMPLE MOTION:

 Page 3

Page 31

Page 31 of the packet; its text follows
Text of page 31

N/A. Workshop item at this time.

 Page 4

Page 32

Page 32 of the packet; its text follows
Text of page 32

January 18, 2024 Via Email: rcummins@saugatuckcity.com Ryan Cummins, City Manager City of Saugatuck 102 Butler Street PO Box 86 Saugatuck, MI 49453 RE: Maple Street Improvements Planning (DRAFT for City Review/Feedback) Ryan, In coordination with the City of Saugatuck, Saugatuck Township, corridor residents and other stakeholders, Fleis & VandenBrink (F&V) has completed planning activities for various improvements on Maple Street between Blue Star Highway and the work completed in 2023 near North Street, approximately 1 mile in length. The purpose of this planning phase was to identify and evaluate options to help City Council to determine the scope of improvements to be made on Maple Street, looking toward design in 2025 and construction in 2026.

Background and Existing Conditions Maple Street serves as the part of the eastern border of the City, along with being a de facto detour whenever Blue Star Highway is closed for construction, accidents or other reasons. The Maple Street corridor includes significant public utility infrastructure that serves a wider area than the corridor itself – two wastewater lift stations with associated force mains, the City’s two municipal wells, regional stormwater infrastructure and others. A generational improvement project should consider all of these aspects. Water System Infrastructure The existing water main is a combination of 4-inch and 6-inch diameter cast iron pipe. Construction records are not available for much of the corridor, and its age is largely unknown. The water main has experienced several breaks in recent years, which result in costly emergency repairs, boil water advisories and traffic impacts. In recent years, a private water service was discovered to be connected to the system through the private water main that serves the Olde Mill Apartments, which has caused operational issues. As customers are reconnected to the new water main, it is anticipated that situation will be resolved with a direct connection to the public system. Fire hydrant locations and spacing will be coordinated with Kalamazoo Lake Sewer and Water Authority (KLSWA) from an operations and maintenance standpoint (hydrant flushing and other activities) and the Saugatuck Township Fire District (STFD). The City’s two wells are located west of Maple Street. A looped water main connects the wells to the distribution system at Maple Street to the east and along the east side of the high school to the west (the water main loop around the high school was replaced in recent years). This water main was identified as a priority for replacement in recent years, as it is expected to be similar age and construction as on Maple Street. The water main connection to Maple Street is through an easement on private property, while the access road to the wells uses the frontage of the City’s property.

Maple Street Planning Report

2960 Lucerne Dr SE, Suite 100 Grand Rapids, MI 49546 P: 616.977.1000 F: 616.977.1005 www.fveng.com

Page 33

Page 33 of the packet; its text follows
Text of page 33

Ryan Cummins, City Manager │ City of Saugatuck │ January 18, 2024 Page 2 of 5

In 2024, the City received a Technical, Managerial, and Financial (TMF) Grant from the Michigan Department of Environment, Great Lakes and Energy (EGLE) to investigate the materials of its customers’ existing water services for which the material was unknown. The TMF project is ongoing and will not confirm 100% of the service materials, however, those results that are available have been incorporated here. Of the 18 City water services on Maple Street that have been physically exposed (“potholed”) as part of the TMF project, eight were found to be galvanized, four copper, and six plastic. EGLE’s current Lead and Copper Rule requires galvanized services to be replaced from the main to the home/business, as they are more likely to contain leaded “gooseneck” connections at the water main (or may have at some point in the past). The Township recently undertook a similar process and has reported similar results for their services in the corridor. Wastewater System Infrastructure Wastewater system infrastructure in the corridor includes sanitary sewer collection system piping, primarily 8inch diameter, a lift station on the west side of Maple Street north of Mason Street (with forcemain running south in Maple Street and west in Mason Street), a lift station on the east side of Maple Street south of North Street (with forcemain running north in Maple Street and west in North Street) and a pair of 16-inch forcemains that cross through the Maple Street corridor around 610 N Maple Street. Most of the corridor is served with sanitary sewer, with the exception of approximately 3 City parcels near North Street (Ridgewood Apartments are served through the lift station near North Street), which are assumed to be served by private septic systems. The existing wastewater infrastructure was evaluated in 2016 as a part of the KLSWA Stormwater, Asset Management and Wastewater (SAW) project. The sanitary sewer was televised, and the condition of the manholes was evaluated. The sewer was generally found to be in fair to good condition. Recommended repairs included lining one section of sanitary sewer and repairs to most of the manholes. Drainage System Infrastructure A series of cross culverts run underneath Maple Street, carrying stormwater runoff from the east side of the road to the west, following the topography of the area. They include a 12-inch crossing at Blue Star Highway, a 36-inch plus 12/15-inch crossing north of Mason Street (which is the end point of the Allegan County Drain Commissioner’s ongoing Blue Star Highway Drain project), a 15-inch crossing south of Ridgeview Lane, a 36inch crossing near 730 N Maple Street, and a 15-inch crossing just south of North Street (which was evaluated in 2022-2023 as part of that project). Visual evaluation was completed as part of this planning process and additional investigation is being considered, however, visual evaluation has found the observable portions of the culverts to be in an acceptable condition. The City has storm sewer infrastructure at many of the intersections within the corridor and sections along the west side of the road between Blue Star Highway and Mason Street with an outfall in the northwest quadrant of the Mason Street intersection, serving portions of Pleasant Street, Allegan Street, Mason Street and Maple Street itself. Between Mason Street and North Street, storm sewer infrastructure is limited to the area between Maple Woods Drive and north of Singapore Drive, which primarily serves the corridor itself. Notably, the City’s outfall at the northwest quadrant of Mason Street outfalls to an open channel (small stream) that runs through private properties to the northwest. F&V completed a drainage study in 2022 (letter report dated November 22, 2022) that reviewed bank erosion concerns in the open channel and presented a range of mitigation options, which have been further evaluated and incorporated in this planning process. The south approach of Maple Street at Blue Star Highway has experienced seasonal seepage through the pavement for a number of years, which is a maintenance concern and tends to prematurely deteriorate the road. A similar condition existed on Campbell Road near Park/Ferry Street and was resolved with additional underdrain. The current roadway is not curbed, either with asphalt or concrete. Water sheds off the road into the adjacent green areas and in some cases shallow swales or ditches before entering the storm sewer system, where it exists. Roadway Infrastructure The asphalt pavement received a Paser Rating of 2 (“very poor”) in the 2022 Paser Rating study and has deteriorated further since that time. The Department of Public Works (DPW) regularly patches potholes, but the additional traffic during closure of Blue Star Highway in 2024 for roundabout construction highlighted the

Maple Street Planning Report

Page 34

Page 34 of the packet; its text follows
Text of page 34

Ryan Cummins, City Manager │ City of Saugatuck │ January 18, 2024 Page 3 of 5

deteriorated condition of the roadway on Maple Street. The asphalt is beyond its useful life and needs to be replaced, along with improvement of the base material. Non-Motorized Infrastructure Finally, the Maple Street corridor currently has no non-motorized infrastructure, and the pavement is narrow, making walking or other non-motorized travel problematic. The City and Township have sidewalk on the north side of Allegan Street and are working toward constructing the Blue Star Trail, which is anticipated to cross Maple Street along the north side of Blue Star Highway. No other cross streets in the corridor currently have non-motorized facilities. Other Infrastructure The Maple Street corridor serves as secondary/rear access for the City’s DPW facilities at 3338 Blue Star Highway and the STFD facility at 3342 Blue Star Highway. Configuration and construction of the drive approaches for both facilities will be coordinated with the appropriate personnel. The asphalt pavement at the DPW facility is in poor condition and has been considered as part of planning activities.

Evaluation of Options F&V considered all of the above concerns during this planning process and identified improvement options for the City’s consideration. Water System Infrastructure The existing 4-inch and 6-inch water main should be replaced with an 8-inch water main. While 6-inch is the minimum allowable diameter allowed by EGLE for public water main, 8-inch is the recommended minimum size, as it provides significantly greater capacity for fire flows with just a nominal increase in cost. An updated water agreement amongst the community members of KLSWA is in process. In the meantime, F&V met with representatives from the City and the Township to discuss a 50-50 cost sharing for the water main and related infrastructure (fittings, valves and hydrants) in the portion of the corridor that has City parcels on the west side and Township parcels on the east side (near North Street, the City Limits cover both sides of Maple Street). A similar cost sharing for one lane of road restoration was also discussed, as that work is required for water main replacement. The details will need to be finalized, but based on the discussion, cost estimates have been broken down using those assumptions, as well as each community being responsible for water service replacements for customers within its own jurisdiction. This breakdown is in alignment with the City’s recent project on Cambell Road with Douglas, in terms of precedent. Another item in the ongoing water system agreement discussions is the development of standard specifications amongst the KLSWA member communities. The Maple Street project could be an opportunity for determining/using those standards. An estimate has provided for replacing the water main loop for the well field between Maple Street and the high school loop. In light of the ongoing discussions related to ownership of this infrastructure, we would recommend constructing a simple stub for future relocation of the connection at Maple Street (relocating it from the easement to follow the access road) and addressing replacement of the loop itself with a future project. Wastewater System Infrastructure In accordance with the recommendations from the KLSWA SAW project, cost estimates have been prepared for a section of sewer lining and manhole repairs. Similar to the water main, it is assumed that sanitary sewer and manhole repairs would be shared costs, as they all occur in the portion of the corridor with City parcels on the west side and Township on the east. A separate estimate has been prepared for extending 8-inch sanitary sewer to serve 721, 730, and 1042 N Maple Street, all of which are located in the City (1039 is Ridgewood Apartments, which is already served and the parcel north of 1042 is City-owned property, primarily Goshorn Creek floodplain area not suitable for development). With only three parcels, the cost per parcel may make gravity sewer extension cost prohibitive. Instead, the City could consider extending smaller diameter (~2-inch) and shallower pipe for future grinder/ejector pump connections (how 713 N Maple is connected to the system), which would be a much more cost-effective solution.

Maple Street Planning Report

Page 35

Page 35 of the packet; its text follows
Text of page 35

Ryan Cummins, City Manager │ City of Saugatuck │ January 18, 2024 Page 4 of 5

Drainage System Infrastructure Visual evaluation of the culvert crossings was completed as part of the planning process, to the extent they are observable from the ends of the pipe. Additional evaluation with sewer televising or other technology is currently being discussed with the DPW. Based on the visual evaluation, the cross culverts appear to be in serviceable condition. It is anticipated that the cross culverts could be lined or other repairs made short of full replacement, if conditions warrant at some point. We have prepared cost estimates for replacement for reference. Storm sewer in the corridor is relatively new. Adjustment of structures and other nominal modifications are anticipated as part of road improvements and are included in those estimates. To help mitigate peak flows at the Mason Street storm sewer outfall (and lower the erosive forces downstream), we have prepared a cost estimate for constructing underground detention at the intersection of Maple Street and Mason Street. Property acquisition required for a traditional detention pond proved to be cost-prohibitive and redirecting the flow is anticipated to have environmental and maintenance challenges, along with potentially causing or exacerbating similar erosion issues elsewhere. A cost estimate has been prepared to address the seepage issues on the south side of Blue Star Highway. Because it is not directly contiguous with the rest of the project, the City could consider addressing the seepage as part of a future or standalone project without affecting the other work in the corridor. In conjunction with road improvements, the City could curb the road, either with concrete curb and gutter or asphalt valley gutter. To realize the full benefit of curbing the roadway, a series of catch basins (or leach basins) and storm sewer would be required (the alternative would be a series of spillways to improved swales/ditches. A public open house was held on September 17, 2024. A few drainage concerns were raised, but they were not generally ones that curbing would directly address. Furthermore, curbing the road improves the efficiency of transporting stormwater. Similar improvements on other streets in the area are understood to have contributed to the current concerns at the Mason Street outfall. Cost estimates for curbing, either with concrete or asphalt, have been provided, but based on cost and other factors are likely not warranted. Roadway Infrastructure Replacement of the water main will require reconstructing the west lane of the road, which involves installing new sand subbase (typically 12 inches) and gravel aggregate base (typically 8 inches) prior to asphalt paving. The east lane could be reconstructed to match the west, or a crush and shape strategy could be used. Crush and shape involves grinding up the existing pavement to supplement the existing base materials and placing new asphalt on the improved base. Crush and shape will raise the road elevation a few inches. With less earthwork required, crush and shape is less costly than full reconstruction, while still improving the base strength. This was the strategy used on the recent Campbell Road project. Allegan Street between Lake Street and Elizabeth Street is a recent example of a full reconstruction. Cost estimates have been provided for both options and we consider them to be “good” and “better”. A 3-inch asphalt thickness is common of residential streets. Cost estimates include 4 inches for Maple Street, due to DPW and STFD and other non-residential properties along the corridor. The assumed cross section for either option is a 10-foot travel lane, with 1-foot asphalt shoulders and 2-foot gravel shoulders. Striping the shoulder helps to make the road feel narrower to drivers, a traffic calming strategy for controlling speeds that tend to increase on new, smooth asphalt. The City received $250,000 in funding from the Michigan Department of Transportation’s Category B (Villages and Small Cities) program, which will offset some of the roadway costs. The application for that funding assumed a crush and shape strategy would be used for the east side of the road, but we anticipate MDOT would be open to the reconstruction option as well. Non-Motorized Infrastructure The addition of non-motorized infrastructure has been a focus of the planning process and was the most common topic of conversation at the open house. Cost estimates have been developed for three options (a combination could be used also). A widened shoulder could be a 3-foot asphalt shoulder on the west side of Maple Street (the width selected for Campbell Road), which is what the cost estimate reflects. It could also be widened shoulder on the east side or

Maple Street Planning Report

Page 36

Page 36 of the packet; its text follows
Text of page 36

Ryan Cummins, City Manager │ City of Saugatuck │ January 18, 2024 Page 5 of 5

both sides. A widened shoulder has the advantage of being the lowest cost option, both in terms of the initial capital cost and the long-term maintenance cost (the asphalt can be plowed, resurfaced, etc. along with the rest of the road). One disadvantage is that it places non-motorized corridor users directly adjacent to the vehicle lane, though it would still be an improvement. Another disadvantage is the wider pavement potentially producing increased speeds. A standard 5-foot concrete sidewalk could be constructed on the west side of Maple Street. Sidewalks tend to be constructed in straight segments but can also be strategically curved around trees and other obstructions to limit the impact, which is one of the concerns commonly raised at the open house. An asphalt path could also be constructed. The practical minimum pavement width (based on readily available asphalt paving equipment) is approximately 6 feet, which is what has been used in the cost estimate. The slightly wider section has proportionally greater impact, but asphalt tends to be more conducive to curved alignments around obstructions. The additional width also more conducive to bicycle traffic (some communities restrict bicycle riding on sidewalks). Removals, grading, retaining walls and fencing are anticipated for either a sidewalk or path, depending on the northern limits of construction. For the purposes of the estimates, the northern end point has assumed to be the Ridgewood Apartments entrance area. All these options were discussed at the open house. From the responses received during and following the open house, approximately 7% of respondents wanted no pedestrian facility, 10% wanted a widened shoulder, 34% wanted a sidewalk, and 7% wanted an HMA shared use path. 21% wanted some version of a pedestrian facility but had no opinion on which of the options occurred. 21% of respondents had no opinion on the matter. All but one of the 29 responses received were from year-round residents. Other Infrastructure As part of road improvements, some portion of all drive approaches will need to be rebuilt, including the STFD approach. Sight distance for that approach is impacted by a large tree (approximately 5-foot diameter) directly adjacent to the road. Its proximity to the vehicle lane makes the tree a hazard to the road itself. Removal of that tree is recommended. Repaving the parking lot and access roads at the DPW facility has been on the DPW’s “wish list” for some time. With the DPW property being adjacent to the work occurring on Maple Street, it would be economically efficient to including crushing, shaping and resurfacing those areas as a part of this project. A cost estimate has been provided for Council’s consideration.

Conclusion Cost estimates for the various options presented are attached. The cost estimates are presented in a “menu” format to allow the City to pick which options they want to move forward with vs. which options they want to forgo. We will prepare a proposal for design phase engineering services when the project scope has been determined. We appreciate the opportunity to assist you with this study and look forward to discussing it with City Council and other stakeholders. In the meantime, please feel free to contact us with any questions. Sincerely, FLEIS & VANDENBRINK

Jonathan Moxey, P.E. Project Manager Cc:

Peter Tierney, P. E. Project Engineer

Scott Herbert, City of Saugatuck, Public Works Superintendent (scott@saugatuckcity.com)

Maple Street Planning Report

Page 37

Page 37 of the packet; its text follows
Text of page 37

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost Maple Street ImprovementsBlue Star Highway to S of North Street Summary of Estimates Project: 859771 Date: 12/16/2024 By: PMT

Description: Summary of Estimates Water Main Estimates Option Project Estimate Water Main Loop Replacement $ 430,000 Water Main Replacement (City) $ 835,000 Water Main Replacement (Township) $ 835,000

Pedestrian Facilities Estimates Option Project Estimate Widened HMA Shoulder $ 120,000 5-foot Concrete Sidewalk $ 1,070,000 6-foot HMA Path $ 1,160,000

Sanitary Sewer Estimate Option Project Estimate Sanitary Sewer Repairs (City) $ 60,000 Sanitary Sewer Repairs (Township) $ 60,000 Sanitary Sewer Extension $ 130,000

Road Rehabilitation Estimates Option Project Estimate Crush and Shape (City) $ 1,005,000 Crush and Shape (Township) $ 405,000 Full Road Reconstruction (City) $ 1,420,000 Full Road Reconstruction (Township) $ 410,000

Storm Water Estimates Option Seepage Repair Underground Detention

Project Estimate $ 40,000 $ 120,000

Cross Culvert Replacement HMA Valley Gutter Concrete Curb and Gutter

DPW Paving Estimate Option DPW Paving

Project Estimate $ 170,000

170,000 860,000 1,080,000

Page 38

Page 38 of the packet; its text follows
Text of page 38

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Water Main Replacement Project: 859771 Date: 12/16/2024 By: PMT

Description: Water Main Replacement along Maple Street, including water services along the road. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

LSum

ESTIMATE UNIT PRICE $ 60,475.00

ESTIMATED AMOUNT $ 60,475.00

Remove Hydrant

Each

1,500.00

10,500.00

8" Watermain

Ft

4,450

120.00

534,000.00

6" Water Main

Ft

110.00

11,000.00

8" Valve & Box

Each

2,750.00

90,750.00

6" Valve & Box

Each

2,100.00

35,700.00

8"x8"x8" Tee

Each

1,250.00

7,500.00

8"x8"x6" Tee

Each

1,200.00

14,400.00

45 Deg Bend, 8 inch

Each

700.00

14,000.00

Fire Hydrant

Each

6,000.00

72,000.00

Connect to Existing Watermain

Each

3,000.00

24,000.00

Cut & Plug Existing Watermain

Each

1,600.00

12,800.00

1" Corporation, Curb Stop and Box (City side)

Each

1,400.00

43,400.00

1" Water Service (City side)

Ft

2,015

55.00

110,825.00

Water Service, Building Connection (City side)

Each

1,200.00

37,200.00

1" Corporation, Curb Stop and Box (Township side)

Each

1,400.00

43,400.00

1" Water Service (Township side)

Ft

2,015

55.00

110,825.00

Water Service, Building Connection (Township side)

Each

1,200.00

37,200.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

1,270,000 200,000 200,000

Total Estimated Project Budget (Rounded): $

1,670,000

Total Estimated Project Budget (City - 50%) $ Total Estimated Project Budget (Township - 50%) $

835,000 835,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 39

Page 39 of the packet; its text follows
Text of page 39

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Water Main Loop Replacement Project: 859771 Date: 10/31/2024 By: PMT

Description: Replacing water main loop behind the Saugatuck High School. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

ESTIMATED AMOUNT $ 15,500.00

ESTIMATE UNIT PRICE $ 15,500.00

Clearing

Acre

35,000.00

35,000.00

12" Watermain, Directional Drill

Ft

225.00

202,500.00

12" Watermain

Ft

135.00

40,500.00

12" Valve & Box

Each

3,250.00

26,000.00

Connect to Existing Watermain

Each

2,000.00

6,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

330,000 50,000 50,000

Total Estimated Project Budget (Rounded): $

430,000

UNIT

QUANTITY

LSum

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 40

Page 40 of the packet; its text follows
Text of page 40

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Sanitary Sewer Repairs Project: 859771 Date: 12/16/2024 By: PMT

Description: Sanitary Sewer Repairs along Maple Street. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5% 2

Sanitary Sewer Lining

Sanitary Frame & Cover Replacement & Adjustment

Sanitary Chimney Repair

Grout Sanitary Structure Joints

LSum

ESTIMATE UNIT PRICE $ 3,600.00

Ft

60.00

18,000.00

Each

2,500.00

35,000.00

Each

2,000.00

12,000.00

Each

1,000.00

7,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

80,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

120,000

Total Estimated Project Budget (City - 50%) $ Total Estimated Project Budget (Township - 50%) $

60,000 60,000

UNIT

QUANTITY

ESTIMATED AMOUNT $ 3,600.00

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 41

Page 41 of the packet; its text follows
Text of page 41

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Sanitary Sewer Extension Project: 859771 Date: 12/16/2024 By: PMT

Description: Extend existing sanitary sewer to service #713, #721, #730, and #1042.

LSum

ESTIMATE UNIT PRICE $ 4,122.50

Sanitary Sewer, 8 inch

Ft

80.00

Sanitary Manhole, 48 inch

Ea

4,500.00

9,000.00

Sanitary Manhole Cover

Ea

1,000.00

2,000.00

8"x6" Wye

Ea

300.00

1,200.00

Sanitary Lateral, 6 inch

Ft

35.00

5,250.00

Sanitary Manhole Tap, 8 inch

Ea

1,000.00

1,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

90,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

130,000

ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

ESTIMATED AMOUNT $ 4,122.50 64,000.00

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 42

Page 42 of the packet; its text follows
Text of page 42

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Cross Culvert Replacement Project: 859771 Date: 10/31/2024 By: PMT

Description: Replace 3 cross culvert across Maple Street. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

ESTIMATED AMOUNT $ 5,935.00

LSum

ESTIMATE UNIT PRICE $ 5,935.00

Culvert, 72-inch

Ft

400.00

76,000.00

Culvert End Section, 72 inch

Ea

7,500.00

30,000.00

Culvert, 30-inch

Ft

170.00

8,500.00

Culvert End Section, 30 inch

Ea

2,100.00

4,200.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

130,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

170,000

UNIT

QUANTITY

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 43

Page 43 of the packet; its text follows
Text of page 43

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Underground Detention Project: 859771 Date: 10/31/2024 By: PMT

Description: Installation of approximately 3,000 cft of storm water detention at Maple Street & Mason Street. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5% 2

ADS Storm Water Detention

ESTIMATE UNIT PRICE $ 3,750.00

ESTIMATED AMOUNT $ 3,750.00

75,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

80,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

120,000

UNIT

QUANTITY

LSum

Cft

3,000

25.00

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 44

Page 44 of the packet; its text follows
Text of page 44

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Blue Star Hwy Seepage Repair Project: 859771 Date: 10/31/2024 By: PMT

Description: Repair seepage issue at Maple Street and Blue Star Highway. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

ESTIMATED AMOUNT $ 511.25

LSum

ESTIMATE UNIT PRICE $ 511.25

HMA Surface, Rem

Syd

10.00

750.00

Underdrain, 6 inch

Ft

15.00

1,275.00

Underdrain, End Section

Ea

200.00

400.00

Subbase

Cyd

18.00

450.00

8" Aggregate Base

Syd

18.00

1,350.00

Hand Patching

Ton

200.00

6,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

20,000 10,000 10,000

Total Estimated Project Budget (Rounded): $

40,000

UNIT

QUANTITY

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 45

Page 45 of the packet; its text follows
Text of page 45

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street HMA Valley Gutter Project: 859771 Date: 10/31/2024 By: PMT

Description: Installing HMA Valley Gutter along Maple Street, including storm sewer and all related work. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

ESTIMATED AMOUNT $ 31,230.00

LSum

ESTIMATE UNIT PRICE $ 31,230.00

Surface Restoration - Filling in existing ditching

Sta

300.00

15,000.00

Storm Sewer

Ft

3,750

100.00

375,000.00

Dr Structures

Ea

4,500.00

135,000.00

Subbase

Cyd

18.00

17,100.00

HMA, 13A

Ton

110.00

29,700.00

HMA Valley Gutter

Ft

8,800

6.00

52,800.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

660,000 100,000 100,000

Total Estimated Project Budget (Rounded): $

860,000

UNIT

QUANTITY

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 46

Page 46 of the packet; its text follows
Text of page 46

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Concrete Curb & Gutter Project: 859771 Date: 10/31/2024 By: PMT

Description: Installing concrete curb and gutter along Maple Street, including storm sewer and all related work. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

ESTIMATED AMOUNT $ 38,980.00

LSum

ESTIMATE UNIT PRICE $ 38,980.00

Surface Restoration - Filling in existing ditching

Sta

300.00

15,000.00

Storm Sewer

Ft

3,750

100.00

375,000.00

Dr Structures

Ea

4,500.00

135,000.00

Subbase

Cyd

18.00

17,100.00

Curb and Gutter

Ft

9,500

25.00

237,500.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

820,000 130,000 130,000

Total Estimated Project Budget (Rounded): $

1,080,000

UNIT

QUANTITY

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 47

Page 47 of the packet; its text follows
Text of page 47

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Crush and Shape Project: 859771 Date: 12/16/2024 By: PMT

Description: West lane road reconstruct and east lane crush and shape, with 10' HMA lanes, 1' HMA shoulder, 4" of Asphalt and 2' gravel shoulders.

ITEM NUMBER

ITEM DESCRIPTION

UNIT

QUANTITY QUANTITY QUANTITY (CITY (CITY/TOWNSHIP (CITY ONLY ONLY - EAST TOTAL WEST LANE NORTH OF LANE SOUTH OF QUANTITIES SOUTH OF 721 721 MAPLE) 721 MAPLE) MAPLE) 0.14 0.43 0.43 1.00

ESTIMATE UNIT PRICE

ESTIMATED AMOUNT (CITY ONLY)

ESTIMATED AMOUNT (CITY/TOWNSHIP)

General Conditions, Bonds, and Insurances, Max. 5%

LSum

$ 50,522.00

28,797.54

Pre-Construction Video Survey

LSum

0.14

0.43

0.43

1.00

3,000.00

1,710.00

21,724.46 1,290.00

Traffic Control

LSum

0.14

0.43

0.43

1.00

$ 35,000.00

19,950.00

15,050.00

Tree Removal 37"+

Each

4,000.00

4,000.00

4,000.00

HMA Base Crushing and Shaping

Syd

5,600

6,450

4.00

25,800.00

Remove HMA Pavement

Syd

5,800

6,650

10.00

8,500.00

Remove HMA Driveway

Syd

1,025

10.00

7,000.00

3,250.00

HMA Approach

Ton

175.00

22,750.00

10,500.00 4,225.00

58,000.00

Approach, Cl I, 6 inch

Syd

1,025

13.00

9,100.00

Approach, Cl II, 6 inch

Syd

1,080

13.00

9,620.00

4,420.00

Remove Concrete Driveway

Syd

15.00

3,000.00

3,375.00

Roadway Grading

Sta

0.65

0.00

21.00

21.65

4,500.00

2,925.00

94,500.00

Shld Gravel, 4 inch

Syd

1,870

1,870

4,040

8.00

17,360.00

14,960.00

Curb and Gutter

Ft

35.00

4,200.00

6,125.00

HMA Valley Gutter

Ft

1,115

6.00

3,990.00

2,700.00

Subbase

Cyd

2,000

2,280

18.00

5,040.00

36,000.00

8" Aggregate Base

Syd

5,800

6,650

18.00

15,300.00

104,400.00

HMA, 13A

Ton

1,400

1,500

3,290

110.00

196,900.00

165,000.00

6" Nonreinforced Concrete Driveway

Syd

60.00

12,000.00

13,500.00

Turf Establishment

Syd

2,150

2,150

5,000

20.00

57,000.00

43,000.00

CITY ONLY

CITY & TOWNSHIP 50%-50%

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

460,000 70,000 70,000

610,000 100,000 100,000

Total Estimated Project Budget (Rounded): $

600,000

810,000

Total Estimated Project Budget (CITY - Rounded): $ Total Estimated Project Budget (TOWNSHIP - Rounded): $

1,005,000 405,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 48

Page 48 of the packet; its text follows
Text of page 48

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Full Road Reconstruction Project: 859771 Date: 12/16/2024 By: PMT

Description: Full road reconstruction, with 10' HMA lanes, 1' HMA shoulder, 4" of Asphalt and 2' gravel shoulders.

ITEM NUMBER

ITEM DESCRIPTION

UNIT

QUANTITY QUANTITY QUANTITY (CITY ONLY - (CITY/TOWNSHIP (CITY ONLY WEST LANE EAST LANE NORTH OF 721 SOUTH OF 721 SOUTH OF 721 MAPLE) MAPLE) MAPLE)

TOTAL QUANTITIES

ESTIMATE UNIT PRICE

ESTIMATED ESTIMATED AMOUNT (CITY AMOUNT ONLY) (CITY/TOWNSHIP)

General Conditions, Bonds, and Insurances, Max. 5%

LSum

0.14

0.43

0.43

1.00

65,498.00 $

37,333.86

Pre-Construction Video Survey

LSum

0.14

0.43

0.43

1.00

3,000.00

1,710.00

1,290.00

Traffic Control

LSum

0.14

0.43

0.43

1.00

35,000.00

19,950.00

15,050.00

Tree Removal 37"+

Each

4,000.00

4,000.00

4,000.00

Remove HMA Pavement

Syd

1,700

5,600

5,800

13,100

10.00

73,000.00

58,000.00

Syd

1,025

Remove HMA Driveway

28,164.14

10.00

7,000.00

3,250.00

HMA Approach

Ton

175.00

22,750.00

10,500.00

Approach, Cl I, 6 inch

Syd

1,025

13.00

9,100.00

4,225.00 4,420.00

Approach, Cl II, 6 inch

Syd

1,080

13.00

9,620.00

Remove Concrete Driveway

Syd

15.00

3,000.00

3,375.00

Roadway Grading

Sta

0.65

21.00

21.00

42.65

4,500.00

97,425.00

94,500.00

Shld Gravel, 4 inch

Syd

1,870

1,870

4,040

8.00

17,360.00

14,960.00

Curb and Gutter

Ft

35.00

4,200.00

6,125.00

HMA Valley Gutter

Ft

1,115

6.00

3,990.00

2,700.00

Subbase

Cyd

2,000

2,000

4,570

18.00

46,260.00

36,000.00

8" Aggregate Base

Syd

1,800

6,000

5,800

13,600

18.00

140,400.00

104,400.00

HMA, 13A

Ton

1,400

1,500

3,290

110.00

196,900.00

165,000.00

6" Nonreinforced Concrete Driveway

Syd

60.00

12,000.00

13,500.00

Turf Establishment

Syd

2,150

2,150

5,000

20.00

57,000.00

43,000.00

CITY ONLY Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

CITY & TOWNSHIP 50%-50%

770,000 120,000 120,000

620,000 100,000 100,000

Total Estimated Project Budget (Rounded): $

1,010,000

820,000

Total Estimated Project Budget (CITY - Rounded): $ Total Estimated Project Budget (TOWNSHIP - Rounded): $

1,420,000 410,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 49

Page 49 of the packet; its text follows
Text of page 49

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Widened Shoulder Project: 859771 Date: 10/31/2024 By: PMT

Description: Place additional 2' of HMA shoulder for a total of a 3' HMA shoulder. This will only be on the west side of Maple Street. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

ESTIMATE UNIT PRICE $ 3,337.50

ESTIMATED AMOUNT $ 3,337.50

LSum

HMA Aggregate Base

Syd

1,400

18.00

Subbase

Cyd

18.00

8,550.00

HMA, 13A

Ton

110.00

33,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

80,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

120,000

25,200.00

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 50

Page 50 of the packet; its text follows
Text of page 50

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street 5-Foot Concrete Sidewalk Project: 859771 Date: 10/31/2024 By: PMT

Description: Installation of a 5-foot concrete sidewalk along the west side of Maple Street, including tree and landscaping removal and driveway culvert replacements ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

ESTIMATE UNIT PRICE $ 38,357.50

ESTIMATED AMOUNT $ 38,357.50

LSum

Landscape Removal/Repair

LSum

30,000.00

30,000.00

Clearing

LSum

25,000.00

25,000.00

Tree Removal 6" to 18"

Each

1,000.00

23,000.00

Tree Removal 19" to 36"

Each

2,000.00

52,000.00

Tree Removal 37"+

Each

4,000.00

24,000.00

Ditching

Sta

4.50

600.00

2,700.00

4" Concrete Sidewalk

Sft

21,000

7.00

147,000.00

6" Concrete Sidewalk Ramp, ADA

Sft

1,500

13.00

19,500.00

Detectable Warning Surface

Ft

80.00

6,400.00

Subbase

Cyd

18.00

9,000.00

Retaining Wall

Sft

3,500

100.00

350,000.00

Fencing

Ft

40.00

28,000.00

Driveway Culvert Replacement

Ft

65.00

40,950.00

Culvert End Section

Each

600.00

9,600.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

810,000 130,000 130,000

Total Estimated Project Budget (Rounded): $

1,070,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 51

Page 51 of the packet; its text follows
Text of page 51

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street 6-Foot HMA Path Project: 859771 Date: 10/31/2024 By: PMT

Description: Installation of a 6-foot HMA Path along the west side of Maple Street, including tree and landscaping removal and driveway culvert replacements ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

ESTIMATE UNIT PRICE $ 41,723.75

ESTIMATED AMOUNT $ 41,723.75

LSum

Landscape Removal/Repair

LSum

30,000.00

30,000.00

Clearing

LSum

25,000.00

25,000.00

Tree Removal 6" to 18"

Each

1,000.00

23,000.00

Tree Removal 19" to 36"

Each

2,000.00

52,000.00

Tree Removal 37"+

Each

4,000.00

24,000.00

Ditching

Sta

4.50

600.00

2,700.00

Shared-Use Path, Grading

Ft

5,000

20.00

100,000.00

HMA shared use Path (3")

Ton

125.00

53,125.00

Aggregate Base

Syd

3,300

18.00

59,400.00

Subbase

Cyd

18.00

10,800.00

Detectable Warning Surface

Ft

80.00

6,400.00

6" Concrete Sidewalk Ramp, ADA

Sft

1,500

13.00

19,500.00

Retaining Wall

Sft

3,500

100.00

350,000.00

Fencing

Ft

40.00

28,000.00

Driveway Culvert Replacement

Ft

65.00

40,950.00

Culvert End Section

Each

600.00

9,600.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

880,000 140,000 140,000

Total Estimated Project Budget (Rounded): $

1,160,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 52

Page 52 of the packet; its text follows
Text of page 52

City of Saugatuck Engineer's Pre-Design Estimate of Project Cost** Maple Street ImprovementsBlue Star Highway to S of North Street Resurfacing DPW Parking Lot Project: 859771 Date: 10/31/2024 By: PMT

Description: Crushing and shaping and resurfacing the DPW parking lot. Assume 4" Asphalt. ITEM ITEM DESCRIPTION NUMBER 1 General Conditions, Bonds, and Insurances, Max. 5%

UNIT

QUANTITY

ESTIMATE UNIT PRICE $ 5,970.00

ESTIMATED AMOUNT $ 5,970.00

LSum

HMA Base Crushing and Shaping

Syd

3,600

4.00

14,400.00

HMA, 13A

Ton

110.00

99,000.00

Turf Establishment

Syd

20.00

6,000.00

Subtotal Construction (Rounded): $ Undeveloped Details & Contingencies (15%): $ Engineering, Permitting, and Administration (15%): $

130,000 20,000 20,000

Total Estimated Project Budget (Rounded): $

170,000

**The Design Professional has no control over costs or the price of labor, equipment or materials, or over the Contractor's method of pricing. Bid prices may vary significantly based on these factors and market conditions at time of bid.

Page 53

Page 53 of the packet; its text follows
Text of page 53

MAPLE STREET IMPROVEMENTS

PROJECT PLANNING

Jon Moxey and Peter Tierney: January 22, 2025

Page 54

Page 54 of the packet; its text follows
Text of page 54

Agenda Project Components to Consider ▪ Water System Infrastructure ▪ Wastewater System Infrastructure ▪ Drainage System Infrastructure ▪ Roadway Infrastructure ▪ Non-Motorized Infrastructure ▪ Other Infrastructure

Summary of Anticipated Costs Anticipated Project Schedule / Next Steps Construction Considerations Additional Questions and Discussion

Page 55

Page 55 of the packet; its text follows
Text of page 55

Water System Infrastructure Water Distribution Main ▪ Combination of 4-inch and 6-inch cast iron vs. 8-inch ductile iron recommended and unknown construction date. ▪ Several recent breaks (repair costs, boil water advisories, traffic impacts). ▪ Several water services in the corridor meet the requirements for replacement to the home/building under EGLE’s Lead and Copper Rules. ▪ Replacement is the only practical option. ▪ Estimated project cost is $1,670,000 ($835,000 City cost, assuming a 50/50 cost share with Saugatuck Township).

Page 56

Page 56 of the packet; its text follows
Text of page 56

Water System Infrastructure Well Field Looping ▪ City’s two municipal wells are located on the west side of Maple Street. ▪ Water main is 6” and assumed to be similar age and construction as Maple Street. ▪ Looping connects the wells to the system at Maple Street and at the high school loop, which was recently replaced. ▪ Pipe traverses the ravine area behind the high school. ▪ Estimated project cost is $430,000. Estimate includes upsizing to 12”. ▪ This portion of the project lends itself to a future phase by including a new stub from Maple Street near the access road.

Page 57

Page 57 of the packet; its text follows
Text of page 57

Wastewater System Infrastructure Existing Infrastructure ▪ Two municipal lift stations are located in the corridor (west side north of Mason Street and east side south of North Street) with associated forcemains. ▪ There is a dual 16” forcemain crossing in the corridor. ▪ 8” gravity sewer serves most of the corridor currently. ▪ KLSWA completed a Stormwater, Asset Management and Wastewater (SAW) project in 2016-2018, that evaluated the gravity sewer, manholes and lift stations.

Page 58

Page 58 of the packet; its text follows
Text of page 58

Wastewater System Infrastructure Lift Stations and Forcemains ▪ Neither lift station was identified as having urgent needs, and lift station work would be more conducive to a standalone project than included with the work in Maple Street. ▪ The various forcemains have been illustrated in the survey that will be used for design to help avoid conflict with proposed improvements. Notes will be provided for the contractor to use due care to avoid damaging them during construction. No improvements are anticipated to be necessary as part of the Maple Street project.

Page 59

Page 59 of the packet; its text follows
Text of page 59

Wastewater System Infrastructure Gravity Sewer ▪ Based on the findings from SAW, 300 feet of sewer lining and repair of manholes has been included, with an estimated project cost of $120,000. Similar to the water main, this cost is anticipated to be shared 50/50 with the Township. ▪ Three parcels near North Street (all located within the City) are currently unserved by sanitary sewer (it is assumed the existing homes are on private septic systems). A fourth parcel is currently served via an ejector pump with 2” private force main. The estimated cost to extend traditional 8-inch gravity sewer is $130,000. Alternatively, individual 2” stubs could be provided for future ejector pump connections for a fraction of that cost.

Page 60

Page 60 of the packet; its text follows
Text of page 60

Drainage System Infrastructure Cross Culverts ▪ The corridor includes a series of cross culverts from 12-inch to 36-inch diameter, which were visually evaluated from the ends. ▪ Concrete culverts are in fair to good condition. Corrugated metal culverts are generally in fair condition with several poor or failing sections. Additional investigation is being considered. ▪ The estimated cost for replacement is $170,000. A portion of that, on the order of $30,000 is recommended to budget for spot repairs as part of the Maple Street project. If additional repairs are found to be warranted, they can be made using contingency funds or trenchless technology (e.g. lining) in the future.

Page 61

Page 61 of the packet; its text follows
Text of page 61

Drainage System Infrastructure Storm Sewer ▪ The City has storm sewer at State Street, Allegan to Mason, and near Singapore Drive. ▪ Most storm sewer is newer construction and anticipated to be in fair to good condition. ▪ Cost estimates for roadway improvements include adjustment of structures but no significant storm sewer replacement is anticipated to be necessary.

Page 62

Page 62 of the packet; its text follows
Text of page 62

Drainage System Infrastructure Stormwater Management ▪ Previous improvement projects on Pleasant, Allegan and Mason Streets with curbing and storm sewer have increased downstream impacts. ▪ A 2022 study by F&V presented background and a range of alternatives for mitigation. ▪ Mitigation work began with the installation of leach basins on Takken and Taylor Streets in 2023 and asphalt spillways by the DPW. ▪ The recommended next step is underground detention at the Mason Street intersection as part of the Maple Street project. ▪ The estimated cost to utilize the practical space available is $120,000, which is less than originally presented in 2022 due to combination with the road project. ▪ Periodic maintenance will be required.

Page 63

Page 63 of the packet; its text follows
Text of page 63

Drainage System Infrastructure Seepage Repair ▪ The south approach of Maple Street at Blue Star Highway has had historic seasonal seepage through the pavement. ▪ Seepage is a nuisance and causes premature deterioration of the pavement. ▪ The estimated cost for repair with underdrain to the ditch line is $40,000. ▪ This work is not contiguous to the rest of the work on Maple Street and could be addressed as a standalone or part of a future project.

Page 64

Page 64 of the packet; its text follows
Text of page 64

Drainage System Infrastructure Curbing and Storm Sewer Extension ▪ The road is currently uncurbed, except at several intersections. Road runoff is directed to grassy lawn, shallow swale or ditch areas. ▪ Curbing the road, either with asphalt valley gutter or concrete curb and gutter would require extension of the storm sewer system or a series of spillways. ▪ The estimated cost is $860,000 for asphalt valley gutter or $1,080,000 for concrete curb and gutter (both including associated storm sewer extension). ▪ Additional budget should be allocated to leach basins and/or detention, if either option is selected.

Page 65

Page 65 of the packet; its text follows
Text of page 65

Roadway Infrastructure Road Restoration and Improvement ▪ The road is currently a PASER rating of 2 (or worse), which warrants complete replacement. ▪ The west lane is anticipated to be reconstructed with new sand and gravel base, due to water main trenching. ▪ The east lane could be full reconstruction like the west lane, or crush, shape and resurface, which was the strategy recently used on Campbell Road. ▪ The estimate for part reconstruct and part crush and shape is $1,005,000 City and $405,000 Township (assuming the Township participates 50-50 in the cost of the west lane). The estimate for full reconstruct of both lanes is $1,420,000 City and $410,000 Township (difference being due to rounding). ▪ The City received $250,000 in funding through the MDOT Category B program to help offset a portion of the road costs on the project.

Page 66

Page 66 of the packet; its text follows
Text of page 66

Non-Motorized Infrastructure Alternatives Considered ▪ Do nothing. The existing road is narrow and currently has no non-motorized facilities. Walkers would continue use the road, which a higher traffic volume than most other residential streets. ▪ Widening one or both shoulders (similar to what was recently done on Campbell Road) provides additional space, but directly adjacent to traffic. The estimated cost for one shoulder is $120,000. ▪ Constructing a traditional 5-foot concrete sidewalk has an estimated cost of $1,070,000 between Blue Star Highway and the Ridgewood Oak Apartments entrance, including associated retaining walls and fencing where grade warrants. Sidewalk would generally be straight but curved around more significant obstacles. ▪ Constructing a 6-foot asphalt path has an estimated cost of $1,160,000, using a more curved alignment around obstacles, still with associated retaining walls and fencing, where grade warrants. ▪ Responses received during and following the open house were in favor of including non-motorized facilities (7% none, 10% widened shoulder, 34% sidewalk, 7% asphalt path, 21% any of the options and 21% no opinion provided).

Page 67

Page 67 of the packet; its text follows
Text of page 67

Other Infrastructure ▪ Saugatuck Township Fire District will be engaged on hydrant layout, as well as its drive approach access, which will need to be rebuilt to some degree regardless of the specific road option selected. ▪ The large tree (~5-foot diameter) on the east side of the road south of the STFD access is proposed to be removed for sight distance and related reasons. ▪ The asphalt pavement at the Department of Public Works facility is in poor condition. The estimated cost for crushing, shaping and resurfacing is $170,000. That could be a standalone project but does have some economy of scale advantages for doing it as part of a larger project.

Page 68

Page 68 of the packet; its text follows
Text of page 68

Summary of Estimated Costs

* * Recommended minimum of $30,000 for repairs.

Page 69

Page 69 of the packet; its text follows
Text of page 69

Anticipated Project Schedule / Next Steps Finalize Project Scope – ideally January 2025 Authorize Design Phase Engineering – February 2025 Finalize Cost Sharing Details – Spring/Summer 2025 Design Engineering and Permitting – 2025 Bidding – late 2025 or early 2026 Construction – 2026 (April to November anticipated)

Page 70

Page 70 of the packet; its text follows
Text of page 70

Construction Considerations ▪ Phasing the project provides easier access and may be easier from a budgeting standpoint (extending it over more budget years) but will increase the overall project cost. ▪ During construction, a minimum of one lane will be open for local traffic and emergency vehicles. There will be times when access is only available from one direction or the other, often with a short wait for construction traffic to clear. Access will be on gravel or crushed asphalt during most of the project. ▪ Contract provisions are included to restrict work hours (typically 7am – 7pm, M-F unless authorized otherwise), as well as control noise, dust and other construction nuisances. ▪ Deliveries, trash collection and mail service (if applicable) will be maintained throughout construction using the same access as residents and emergency services. ▪ A formal detour route may not be warranted, due to the nature of Maple Street. BSH is the primary north-south detour.

Page 71

Page 71 of the packet; its text follows
Text of page 71

Additional Questions and Discussion