Project
Lower Crow Dam Safety Upgrade
River or area
Crow Creek and Lower Crow Reservoir
Lower Crow Reservoir, west of Ronan
Program
Status
In design
Now
Preliminary design of the outlet works and embankment stability berm is under way.
Confederated Salish and Kootenai Tribes
Natural Resources Department
Division of Engineering & Water Resources
Project Overview
Lower Crow Dam Safety Upgrades consist of upgrades to the spillway, outlet works, and embankment stability during a probable maximum flood, all to address issues of the aging infrastructure (built in 1922). The spillway upgrades were complete over two phase between 2019 and 2022. The outlet works upgrades are in preliminary design that includes two alternatives: Rehabilitation of existing structure, or entirely new structure. The embankment stability upgrades are in preliminary design, which includes a compacted earthen fill with subsurface perforated drain pipe system located along the downstream base of the dam. Environmental mitigation measures are expected due to construction.
By year
Phases
2019 to 2022
Spillway upgrades
Done
Under way
Outlet works and embankment: preliminary design
To be determined
Construction
Ahead
On site