DEWR (406) 675-2700

Project

Lower Crow Dam Safety Upgrade

River or area

Crow Creek and Lower Crow Reservoir

Lower Crow Reservoir, west of Ronan

Program

Safety of Dams

Status

In design

Now

Preliminary design of the outlet works and embankment stability berm is under way.

Contact

Gregory Wilson

Compact Engineering Officer
(406) 675-2700 ext. 6215

Confederated Salish and Kootenai Tribes
Natural Resources Department
Division of Engineering & Water Resources

Project Overview

Lower Crow Dam Safety Upgrades consist of upgrades to the spillway, outlet works, and embankment stability during a probable maximum flood, all to address issues of the aging infrastructure (built in 1922). The spillway upgrades were complete over two phase between 2019 and 2022. The outlet works upgrades are in preliminary design that includes two alternatives: Rehabilitation of existing structure, or entirely new structure. The embankment stability upgrades are in preliminary design, which includes a compacted earthen fill with subsurface perforated drain pipe system located along the downstream base of the dam. Environmental mitigation measures are expected due to construction.

By year

Phases

  1. 2019 to 2022

    Spillway upgrades

    Done

  2. Under way

    Outlet works and embankment: preliminary design

  3. To be determined

    Construction

    Ahead

On site

Photographs